LNG EXPORT FACILITY SITE PREPARATION AND SOIL IMPROVEMENT
ENTACT performed large-scale soil stabilization services to support the construction of a liquefied natural gas (LNG) export facility on the Gulf Coast. The work provided a stable foundation for major site development activities, ensuring the ground improvement necessary to support future infrastructure and facility operations. Prior to full-scale implementation, ENTACT conducted soil sampling and developed soil-cement mix designs to achieve unconfined compressive strengths (UCS) for target values. Field pilot test sections were completed to confirm cement dosage requirements for meeting these
COAL-FIRED GENERATING STATION CCR POND CLOSURE ACTIVITIES
ENTACT was engaged to perform pond closure, repurposing, and maintenance activities at this coal-fired power plant located along a major river system in the Midwest. Based on the successful completion of the East Bottom Ash Pond Closure, ENTACT was awarded additional work at the facility, as outlined below, on a competitive or sole-sourced basis. Highlighted projects include: East Bottom Ash Pond Closure The EBAP was closed in compliance with CCR Rule 40 CFR Part 257 and Effluent Limit Guidelines 40
LNG LIQUEFACTION SOIL STABILIZATION
The Client’s project involved the expansion of a liquefied natural gas (LNG) terminal to accommodate three LNG trains, a gas pretreatment unit, and a dock. Prior to construction, the ground required reinforcement to support the complete turnkey LNG facility. ENTACT completed the project in 11 months, finishing ahead of schedule and within budget. Upon project completion, ENTACT had: Stabilized more than two million cubic yards of soft dredged sediment and fill soils Performed in-situ stabilization on timber mats and pneumatic
LNG EXPORT FACILITY SOIL IMPROVEMENT
ENTACT performed soil improvement and design-construct earth retention services in support of the expansion of a liquefied natural gas (LNG) terminal on the Gulf Coast. The facility, originally constructed as an import terminal, is being upgraded to include liquefaction and export capabilities. In preparation for this expansion, ENTACT improved subsurface conditions to facilitate equipment access and support construction of the perimeter storm protection levee system. The project required large-scale soil stabilization of 2,040,000 cubic yards of dredged fill material. This work
WET FLY ASH IMPOUNDMENT CLOSURE
ENTACT successfully completed the closure of a 140-acre wet fly ash impoundment containing 13.4 million cubic yards of coal combustion residual (CCR). The project involved a comprehensive approach to manage surface water by pumping and utilizing temporary drainage channels in the deposited ash, directing it to a permitted outfall located behind the main dam. Notable scope items on this project completed by ENTACT: Lowered the main dam and removed the saddle dam Constructed a new spillway for both dams to
FLY ASH IMPOUNDMENT CLOSURE AND DAM MODIFICATION
ENTACT undertook a multiyear phased approach for the closure of a 300-acre wet fly ash impoundment. The project commenced with the drainage of surface water, utilizing pumping and temporary drainage channels to direct water to an area behind the main dam. As surface water was managed, we excavated the exposed fly ash and relocated or regraded the surface to achieve the required subgrade elevations across the site. This careful and coordinated approach ensured effective stormwater management and successful project completion.